What is good ISO 27001 backup restore test evidence?

A dated record of each restore test that names the backup copy that was restored, the asset it belongs to, where it was restored, who ran it, which checks were run and whether it passed, with the restore output attached. A record like that shows an auditor that a copy was brought back and worked, which a backup job log alone cannot show. This note sets out the record field by field, with a worked example and a restore-test record template as a CSV file.

ISO/IEC 27001:2022 covers information backup among its Annex A controls. This note does not quote the standard’s wording, so check it in your licensed copy. The record layout below is Finray’s editorial practice, and an auditor should not be told it is an ISO form.

Backup test or restore test: what is the difference?

The two answer different questions, and an ISMS needs both.

Backup test or restore test: what is the difference?
Backup testRestore test
What it checksThe backup job ran, and the copy is complete and readableThe copy can be brought back and used
Typical methodRead the job log; compare the size or a checksum with what was expectedRestore into a separate environment, then check the data and the application
What it showsA copy existsThe copy works
EvidenceThe job log and the result of the checkThe restore log, the check results and the time the restore took

Schedule them as two obligations, each with its own interval, owner and evidence. In an ISMS annual calendar they are two kinds of recurring work.

What should a restore-test record contain?

One record per test. The example values are synthetic.

What should a restore-test record contain?
FieldExampleWhy it matters
Test referenceRT01An issue or incident can point back to the test
AssetProduction customer databaseTies the test to the asset register
Backup copy restoredCopy taken 14 Jan 2027, 02:00Identifies which copy was tested
Restored intoIsolated restore environment with no route to productionShows the test did not touch live systems
Due date15 Jan 2027With the date performed, shows lateness
Date performed15 Jan 2027When the test actually ran
Performed byDatabase administratorOne named person is accountable
Checked byHead of engineeringA second person confirms the result
Checks runRow counts of five tables compared with the source; application login and one searchStates what “it worked” meant
Time to restore47 minutesComparable with any recovery objective you have set
ResultPass, partial or failThe outcome in one word
Evidence attachedRestore log; output of the row-count queryThe artefact behind the result
Follow-upIssue or incident referenceLinks a failure to its fix
Skip reasonOnly when the test was skippedExplains a missing test

The “checked by” field is optional, but it turns a self-declared pass into a reviewed one. That is the four-eyes principle applied to a test: the person who ran the restore is not the only one who says it passed.

Is a screenshot enough?

Nothing in the sources for this note settles the format of the evidence. A log or query output produced by the system during the test carries its own timestamps, and it is harder to dispute than a screenshot taken afterwards. Prefer it. Add a screenshot where it shows something a log cannot, such as the restored application opening a customer record.

How often should restores be tested?

As often as your backup policy says. This note quotes no frequency from the standard. A workable way to set one is per asset: the more the business depends on an asset, the shorter the interval between restore tests, and the more of the application the test should exercise. Write the interval in the policy, then copy it into the calendar so that the reminder and the record follow from it.

What if a restore test fails?

Record the failure as it happened, with its evidence, and do not overwrite it with the later retest. Open an issue for the fix, or an incident report if data could not be recovered when it was needed, and put the reference in the follow-up field. Then schedule a retest as a one-off obligation. A failed test, its fix and a passed retest, linked to one another, show the control doing its job.

If you keep a risk control matrix, the restore test is a control row, and these records are its test evidence; the risk control matrix template shows the columns such a row needs.

What if a test is skipped?

Write the reason and the date, for example that the database was being migrated and the copy format had changed. A skip moves the series to its next due date, and the reason stays on the record. If the asset was retired, retire the obligation as well, and point to the change record that retired the asset.

How do you find assets with no restore test?

Take every asset in the register that is backed up, or that another asset is a backup of, and look for an active restore-test obligation on it. Each asset without one is a gap. New databases and file stores are a likely source, because they are added to the backup job when they are created and the calendar is easy to forget. The note on the ISO 27001 asset register for a software company shows how to record backup links between assets so that this check can be run.

What does a worked example look like?

The company and records are synthetic. Example Software Ltd tests restores of three assets. These are its tests in the first quarter of 2027; all dates are in 2027.

What does a worked example look like?
TestAsset and datesResult, evidence and follow-up
RT01Production customer database; due 15 Jan, performed 15 JanPass. Restore log and row-count output
RT02Document file store; due 31 Jan, performed 3 FebFail. Restore log showing 212 files unreadable; issue 1187 opened, retest RT04 scheduled
RT03Staging database; due 28 Feb, not performedSkipped. Asset retired under change record CR-0231; obligation retired
RT04Document file store; due 17 Feb, performed 17 FebPass. Restore log, file count and checksum comparison; closes issue 1187

The file store test ran three days late and failed. Its record stays as it was. The fix in issue 1187 changed the backup job, and the one-off retest passed two weeks later. The skipped staging test points to the change record that retired the asset, so the reason can be checked without asking anyone.

Where does Pync fit?

In Pync, Finray’s delivery and ISMS workspace, scheduled maintenance keeps its own trail, as change records and incidents do, traced back to the work. The asset register, incident reports and issues live in the same workspace, as one set of records that point at each other.

Pync keeps the records an auditor asks for. It does not make an organisation compliant or certified, and the tests, intervals and judgements stay with your people. For what to look for in any tool, see ISMS software for small software companies.

Who should run and check the test?

The person who runs the backup job should not be the only one who checks that restores work, for the same reason that the person who enters a payment should not release it. The segregation of duties entry explains the general rule. In a small team, a second person who reviews the record after the test is a reasonable substitute.

Download the record template

Download: backup-restore-test-record-template.csv. It has one row per test and three example rows (a pass, a fail and a skip). The rows are generic examples, and the layout is editorial. This note is not a certification of any backup arrangement.

Frequently asked questions

What is good evidence of a backup restore test?
A dated record of each test that names the backup copy restored, the asset it belongs to, where it was restored, who ran it, which checks were run and whether it passed, with the restore log or query output attached. It shows that a copy was brought back and worked.
Is a backup job log the same as a restore test?
No. A job log shows that a copy was taken and, with a checksum or size check, that it is complete. Only restoring the copy into a separate environment and checking the result shows that it can be used. Schedule the two as separate obligations.
Does ISO 27001 say how often to test restores?
This note quotes no frequency from the standard; check the wording on backup in your licensed copy. Set the interval per asset in your backup policy and keep to it.
Is a screenshot enough as evidence?
Nothing in the sources for this note settles the format. A log or query output produced by the system during the test carries its own timestamps and is harder to dispute than a screenshot taken afterwards, so prefer it, and add a screenshot where it shows something the log cannot.
What if a restore test fails?
Keep the failed record as it is, with its evidence. Open an issue for the fix, or an incident report if data could not be recovered when it was needed, link it from the record, and schedule a retest. The failure, the fix and the passed retest together show the control working.

Sources

Read next

Discuss how this applies to your institution with the Finray team.

Book a briefing

All notes

Certificate of Registration NQA · UKAS Management Systems
ISO/IEC 27001:2022 Certificate of Registration issued by NQA to Finray Technologies Ltd, certificate number 215646, valid 21 October 2025 to 21 October 2028
Search
Type to search across Finray, products, company, and journal.

    Press Esc to close · ↵ to open the highlighted result.

    Book a briefing Step 1 of 3

    What you need

    Which platforms are in scope.

    For example a licence application, an audit or a ledger build-out.

    What happens after you book

    • A team member will respond within one business day with availability windows.
    • Corebanq runs as Cloud SaaS, Private SaaS or an Enterprise Licence.
    • After the briefing, the full Corebanq and XZiel API references are issued with test-environment access.