Skip to content
In the news TRM Labs × Finray — audit-ready crypto transaction monitoring for banking
Finray

How to become a Swiss Interbank Clearing (SIC) participant: the steps from SNB application to go-live

An institution applies to the SNB, signs two contracts, connects and tests in about six to ten weeks, and starts on the first bank working day of a month. The SIC participation steps in order, what each party asks for, the duties after go-live, and the 2026 onboarding freeze.

By
Finray
Published
Reading time
10 min

How do you become a SIC participant?

To become a participant in Swiss Interbank Clearing (SIC), an institution applies to the Swiss National Bank (SNB), signs two contracts once admission is confirmed, connects and tests its systems over about six to ten weeks, and goes live on the first bank working day of a month. The SNB decides who is admitted. SIX Interbank Clearing Ltd operates the system on the SNB’s behalf and handles the connection, the tests and the start date.

Neither party publishes the whole path in one place. The SNB’s instruction sheet covers who may apply and what to send, and stops at admission. SIX’s info centre starts after admission and covers contracts, connection and go-live. This note puts the two halves in order and marks where the public sources end and the non-public SIC Handbook begins.

Status as of 22 November 2026: SIX onboards no new participants in November and December 2026, because the RTGS service is migrating to the new SIC platform. The last possible start date in 2026 was 1 October. SIX has not yet named the first start date in 2027.

The SIC participation steps at a glance

The SIC participation steps at a glance
StepWho actsWhat happensPublic source
1. DecideInstitutionAdmission type, retail or interbank payments, access routeSNB sheet, SIX info centre
2. ApplyInstitution to the SNBWritten application with the documents listed belowSNB sheet, section 7
3. AdmissionSNB and SIX Interbank ClearingAdmission is assessed and confirmedSIX info centre
4. ContractsParticipant, SNB, SIX Interbank ClearingTwo contracts are signed; the SIC Handbook becomes bindingSIX info centre
5. Connect and testParticipant, with its software supplier or service bureauAbout six to ten weeksSIX info centre
6. ConfirmParticipantTechnical and legal requirements confirmed by the 10th of the previous monthSIX info centre
7. Go liveSIX Interbank ClearingFirst bank working day of a month, RTGS and IP togetherSIX info centre, Bank Master

Who can take part, and who decides?

The SNB’s general rule is that a participant must make a significant contribution to the fulfilment of the SNB’s tasks and that its admission must not pose major risks. The decision is the SNB’s. The instruction sheet says the SNB is not bound by it and may widen or restrict admission, in particular for monetary policy reasons.

The sheet sets out three admission types:

Who can take part, and who decides?
SectionAdmission typeTypical use
2.1SIC participation with a sight deposit accountBanks and the other eligible categories that settle payments
2.2SIC participation without a sight deposit accountThird-party system operators, RTGS service only
2.3Sight deposit account without SIC participationFor example a domestic bank with no transaction activity

Under 2.1 the eligible categories are domestic financial market participants such as banks and branches of foreign banks, securities firms that take part in SECOM, central mortgage bond institutions, compenswiss, cash processing operators, certain insurers and collective investment entities, certain financial market infrastructures, and fintech companies under Article 1b of the Banking Act whose business model focuses on payment services in Swiss francs. Each category comes with its own conditions. The licence side of the last group is covered in our note on Swiss fintech licence requirements. The SNB may also permit foreign financial market participants, and at the end of 2025, 44 SIC participants were domiciled outside Switzerland and Liechtenstein.

Participation under 2.1 is direct, without another SIC participant acting as intermediary. As a rule the SNB offers one sight deposit account per participant and one SIC settlement account per participant and service, and the sight deposit account and the settlement accounts form one legal unit. The relationship is governed by contracts between the participant, the SNB and SIX Interbank Clearing Ltd, by the SIC Handbook and by the SNB’s Terms of Business.

What to decide before you apply

Three choices shape the project, and the first one goes into the application itself.

Retail or interbank payments. For participation with a sight deposit account, the application states which kind of payments will be settled. This decides the instant payments duty. The SNB sheet says participants that use the RTGS service for retail payments must also be able to receive payments via the IP service, by November 2026 at the latest. The SNB’s disclosure report adds that banks and licensed fintech companies are considered active in retail payments; one that settles only interbank payments can deselect retail payments in the RTGS service, and the IP duty then falls away. Our note on SIC instant payments requirements covers the deadline wording in detail, and SIC RTGS vs SIC IP explains what the second service changes.

The access route. A participant reaches SIC through the Messaging Gateway, over SSFN or point-to-point networks, either directly or through a service bureau, or through Swift. Standard participants must use the Messaging Gateway unless they average fewer than 1,000 outgoing transactions and less than CHF 100 million turnover per clearing day; those may use Swift. The web portal comes on top of either route and is mandatory for Swift participants. Service bureau vs own connection compares the routes duty by duty.

Who builds and runs the software. SIX asks for a confirmation letter from one participant when a software company develops connection software for participants, and test lines to third-party companies and the authentication and encryption equipment can only be ordered on behalf of, and at the expense of, a participant. So the test lines a supplier needs are ordered and paid for by a participant, and they belong in the project plan from the first week.

Step 1: the application to the SNB

Section 7 of the SNB instruction sheet lists what to send:

  • a written application stating the type and purpose of admission;
  • for participation with a sight deposit account, which kind of payments (retail or interbank) will be settled;
  • a valid Commercial Register extract;
  • a list of authorised signatories;
  • for authorised financial market participants, the licence from the competent supervisory authority;
  • for securities firms, confirmation of participation in SECOM.

The postal and email address of the responsible SNB department is printed in the instruction sheet. Use the current version: it is dated 17 November 2023 and was updated on 27 February 2025, and the German original is authoritative. A 2022 version still appears in search results. It predates the IP service, and its list of categories differs from the current one.

No public source says how long the SNB takes to assess an application.

Step 2: admission and the two contracts

Once the SNB and SIX Interbank Clearing Ltd have confirmed admission, two contracts are signed: the “SIC participant agreement” and the “Agreement regarding participation in the SIC system”. The current SIC Handbook is an integral and binding part of the contract. It is not public; participants reach it through the SIC extranet.

From this point on, many operational details (test cases, the acceptance procedure, master-data forms) are defined in the Handbook. This note does not describe them.

Step 3: connection and tests, about six to ten weeks

SIX gives about six to ten weeks for the connection, and says the duration depends on the participant’s infrastructure, its gateway and successfully completed testing. The clock starts after admission is confirmed and the contract is signed. A plan that counts the ten weeks from the day the application goes to the SNB is short by the whole assessment period.

What has to be in place in those weeks depends on the route. A participant with a direct SSFN connection must be connected redundantly and through more than one carrier. On the Messaging Gateway route the security solution consists of the SIX Advanced Security Server (SASS) and a hardware security module, the CH-HSM. SIX supports the latest and the previous SASS version, and new versions arrive in the first quarter of each year.

Testing runs in stages that SIX describes in public: a validation portal for the messages, then the services’ test systems. SIC IP testing and onboarding walks through both, and the SIC ISO 20022 interbank message set lists the messages and versions that the tests cover.

Step 4: confirmation by the 10th and go-live

Participation normally starts on the first bank working day of a month. The technical and legal requirements must be met and confirmed by the 10th of the previous month; otherwise the start moves by at least one month. The go-live date applies to the RTGS and the IP service at the same time.

A worked example with illustrative dates shows how sharp that rule is. Admission is confirmed and the contracts are signed in the first week of January, and the connection and tests take the full ten weeks, so the work is finished in mid-March. The requirements cannot be confirmed by 10 March, so a start on the first bank working day of April is out of reach, and confirmation by 10 April gives a start in May. Finishing one week earlier would have meant April.

New participants and their start dates are published by SIX under “Mutations in the Bank Master”. SIX’s Bank Master page says changes to participants are published monthly as PDF documents, around the 20th.

After go-live: what a participant must keep doing

SIX lists the duties of a participant:

  • be operational, financially and technically, on SIC operating days until the last incoming payments are settled, including on cantonal and local holidays;
  • receive, process and acknowledge every use case registered in its master data;
  • implement future developments of the system on time.

The last duty follows a yearly rhythm. There is at most one release a year, and it goes live in November.

After go-live: what a participant must keep doing
WhenWhat happens in the release cycle
End of AugustDeadline for change requests for the release after next
FebruarySpecifications for the coming release
JuneInformation on the external test environments
JulyTest environments with the full release scope
OctoberGo-live timetable
NovemberGo-live

For the IP service, being operational means answering every incoming instant payment around the clock. The recipient bank must answer each incoming instant payment. The sender bank informs the payer of the outcome and, if the payment fails, does so immediately, with the reason where the law allows. The clearing-day schedule and what round-the-clock operation involves are set out in SIC clearing day and 24/7 operations.

Leaving, suspension and exclusion

A participant can terminate in writing with three months’ notice to the end of a month, addressed to both the SNB and SIX Interbank Clearing Ltd. The same applies when two participants merge.

The SNB may exclude or suspend a participant that no longer meets the admission criteria, is subject to insolvency measures, breaches the contracts or the SIC Handbook, or presents what the SNB judges a particular risk to the system or to its reputation.

How many institutions take part?

The SNB’s disclosure report counts 295 participants at the end of 2024, most of them banks. SIX Interbank Clearing’s financial report for 2025 counts 310 financial institutions connected to the SIC RTGS system at the end of 2025, including the 44 domiciled outside Switzerland and Liechtenstein. The two reports count differently, so the figures should not be read as a growth rate.

Where Zahlex fits

Zahlex, Finray’s payment operations platform, handles the rail-side path of a payment for SIC RTGS and SIC IP: validation, enrichment, controls before submit, submission, status handling, exceptions and reconciliation. In the sequence above, that is the work from step 3 onwards, once messages start to flow, and the daily operation after go-live. Corebanq holds the ledger, and XZiel screens payments upstream; Zahlex itself does not screen. The customer case on Audax Solutions AG, a SIC RTGS and SIC IP participant that uses Zahlex, sets out the steps to SIC participation as the institution’s own. Audax Solutions AG and Finray Technologies are related parties. For step 3, the page on connecting to SIC directly or through a service bureau compares the two routes rule by rule, the HSM included.

The application, the contracts and the participant’s duties belong to the institution. Finray is a software company, and the institution remains responsible for its regulated activity. Institutions comparing their options can start from the page for Swiss banks and fintechs.

Frequently asked questions

Who do I apply to for SIC participation?
The Swiss National Bank. SIX Interbank Clearing Ltd operates the SIC system on the SNB's behalf, but the SNB decides on admission, and SIX directs participation requests to the SNB.
How long does it take to become a SIC participant?
SIX gives about six to ten weeks for the connection, counted from the point when the SNB and SIX Interbank Clearing have confirmed admission and the contract is signed. No public source gives a duration for the SNB's assessment of the application before that.
When can a new participant start?
Normally on the first bank working day of a month, provided the technical and legal requirements are met and confirmed by the 10th of the previous month. SIX onboards no new participants in November and December 2026.
Can an institution join SIC for instant payments only?
No. Every participant takes part in the RTGS service. The IP service comes on top for a participant that uses customer payments, and the go-live date applies to both services at once.
Can another bank act as my intermediary in SIC?
Not for SIC participation. Participation with a sight deposit account is direct, without another participant acting as intermediary. A service bureau can run the technical connection, but it is not a participant, and the participant's duties stay with the institution.
How does a participant leave SIC?
By written notice of three months to the end of a month, sent to both the SNB and SIX Interbank Clearing Ltd. The same applies when two participants merge.

Sources

Read next

Discuss how this applies to your institution with the Finray team.

Book a briefing

All notes

Certificate of Registration NQA · UKAS Management Systems
ISO/IEC 27001:2022 Certificate of Registration issued by NQA to Finray Technologies Ltd, certificate number 215646, valid 21 October 2025 to 21 October 2028
Search
Type to search across Finray, products, company, and journal.

    Press Esc to close · ↵ to open the highlighted result.

    Book a briefing Step 1 of 3

    What you need

    Which platforms are in scope.

    For example a licence application, an audit or a ledger build-out.

    What happens after you book

    • A team member will respond within one business day with availability windows.
    • Corebanq runs as Cloud SaaS, Private SaaS or an Enterprise Licence.
    • After the briefing, the full Corebanq and XZiel API references are issued with test-environment access.
    • Due-diligence documents, such as a summary of the April 2026 independent penetration test, are available under NDA.