# ISO 27001 change management procedure for software development teams

A change management procedure that an ISO 27001 auditor can follow and a team that releases every day can keep: what counts as a change, the request, approval by someone other than the author, emergency changes, rollback, and where pull requests and AI agents fit.

- Source: https://finray.tech/notes/iso-27001-change-management-software-teams/
- Author: Finray
- Published: 2026-11-22
- Reading time: 8 min
- Publisher: Finray Technologies Ltd, Cyprus Companies Registry HE 445903

---

## What does an ISO 27001 change management procedure for software teams need?

ISO/IEC 27001:2022 lists change management among its Annex A controls. For a software team, a procedure that holds up in an audit gives every change a request that says why, an approval by someone other than the author, a test before release, a way back if it fails, and a record that links the change to the work. A team that releases every day can keep this light by letting the pull request carry the evidence for routine code changes and using a separate request for change (RFC) for the rest.

This note sets out such a procedure. The routes, fields and examples are our suggestion for software teams, and none of them is quoted from the standard. Read the standard itself for the exact wording of the control, and fit the procedure to the scope of your own ISMS.

## What counts as a change?

A change is anything that alters how a system in scope behaves or who can reach it. For a software company that usually covers more than code. The examples below are synthetic.

| Kind of change | Example | Suggested route |
| --- | --- | --- |
| Product code | A validation message for an empty account name | Pull request with checks, independent review and approval |
| Infrastructure and configuration | Raising the connection limit of the production database | RFC |
| Access | Giving an engineer read access to production logs | Access request |
| Credentials | Rotating the staging database credential before the quarterly access review | RFC, scheduled |
| Third-party service | Moving error reporting to a new provider | RFC, with a supplier check |
| Urgent fix | Renewing an expired certificate on the payments API | Emergency change, recorded afterwards |

The point of the table is that every kind of change has exactly one route, written down. An auditor who samples a change will ask which route it should have taken and then check that it did.

## What should a request for change contain?

An RFC answers in advance the questions an approver and, later, an auditor will ask. A practical set of fields:

| Field | What it answers |
| --- | --- |
| Subject | What is changing, in one line |
| Reason | Why the change is needed now |
| Systems affected | Which assets, environments and customers it touches |
| Schedule | When it will be made, and in which window |
| Test and verification | How the team will know it worked |
| Rollback plan | How to return to the earlier state, and who decides to do it |
| Change owner | The person responsible for carrying it out |
| Approver | The person who approves it, who is not the change owner |

Pync keeps RFCs and change records in the same workspace as the issues and the asset register.

## Who approves a change?

Someone other than the author. That is the [four-eyes principle](/intelligence/glossary/four-eyes-principle/), and behind it the design rule of [segregation of duties](/intelligence/glossary/segregation-of-duties/): the person who prepares a change does not also release it. The approver should know the system well enough to judge the risk, which for a database change means someone who understands the database, whatever their title.

When an AI agent writes the change, the agent is the author and the approver is a person. Finray's own path sets the rule out precisely: a person approves the exact version that was reviewed and tested, and any later change to it restarts review. Binding the approval to one version closes the gap in which a small fix made after review reaches production without anyone looking at it again.

## What goes into the change record?

The RFC says what is planned; the change record says what happened. It should show whether the change was implemented and verified, or rolled back, when, by whom, and with a link back to the request and the work that needed it. Pync keeps change records for this in the same workspace as the issues.

Close the record only when the outcome is known. A change that was implemented but never verified is still open.

## How do you handle emergency changes?

Emergency changes are the exception the procedure has to allow for, or people will bypass it. A workable rule has four parts. An emergency change is allowed when waiting would cause more harm than the change itself. A named person authorises it before it is made, even if only by phone. It is recorded afterwards with the reason and a link to the incident report. And each one is reviewed after the fact, to decide whether the same fix should become a normal change next time.

Pync keeps incident reports in the same workspace as change records, so the emergency change and the incident that caused it can be read side by side.

## How do you plan a rollback?

Write the rollback plan before the change, and say who decides to use it. For most code changes the rollback is a return to the previous version. For a database migration or a change to stored data, the rollback has to be designed with the change, because the previous version of the code may not read the new data. If the rollback is used, the change record says so, and the failed change goes back through the procedure as a new request.

## Where do pull requests fit?

For a change to product code, the pull request already holds most of the evidence: the change itself, the automated checks, the review and the approval. A procedure can say that, for routine code changes, the pull request is the change record, as long as the evidence in it is kept and the approver is not the author.

The path a change to Finray's product code takes, as published on [how we build](/company/how-we-build/), shows the kind of evidence such a pull request can carry:

1. the task, recorded in Pync with its acceptance criteria and a plan;
2. a failing test written before the code, then the implementation by an AI agent in an isolated workspace;
3. secret scanning, dependency and vulnerability scanning, static analysis and the test suite on every change to product code;
4. a review by a different AI model family from the one that wrote the change, with findings re-checked in the next review;
5. a live test on a dedicated test environment with synthetic data;
6. a person's approval of the exact version that was reviewed and tested;
7. a merge recorded with who did what and at which version, where who is a person or a model.

[Building bank-grade software with AI agents](/notes/bank-grade-software-with-ai-agents/) maps each of these steps to a control.

## How do changes written by AI agents fit the procedure?

They take the same route as any other change, with the agent as the author. Three rules from Finray's own guideline matter here. Each action stays attributable to the real person or the model that performed it, so the record shows who wrote the change. Agents that drive a browser run only against local, development or test systems and are never pointed at production. And agents work with synthetic data, so customer data, personal data and secrets never reach an AI tool during development.

If an agent drafts the issue for a change in Pync, the issue is created at once, marked as created by AI and not yet valid, and lands in the [Review queue where a person accepts or rejects agent changes](/platforms/pync/ai-agents/). A person accepts it, or rejects it and the issue is removed. The note on [AI agent approval workflows](/notes/ai-agent-approval-workflow/) describes that review.

## A worked example

Three synthetic changes in one week at a software company.

| Change | Route | Approver | Evidence kept |
| --- | --- | --- | --- |
| Validation message for an empty account name, written by an AI agent | Pull request | Engineering lead, on the exact version that was reviewed and tested | Failing test, scan results, review findings, approval, merge record |
| Issue #1042, rotate the staging database credential before the quarterly access review | RFC, scheduled for Tuesday | Platform operations lead | RFC with reason and rollback plan; change record closed as implemented and verified |
| Expired certificate on the payments API | Emergency change | On-call lead, by phone, recorded the same day | Incident report; change record with the justification; review a week later |

In the first row the agent is the author, so the engineering lead's approval is the independent check by a person. In the third, the after-the-fact review leads to a new RFC: a scheduled check of certificate expiry dates, so that the same failure does not become an emergency again.

## Telling customers about planned changes

A change that affects customers may also need to be announced to them. Finray describes how it tells its own customers about planned changes under [incident communication in its trust centre](/trust/incident-communication/).

## Where to read more

The note on [managing AI coding agents in a team](/notes/manage-ai-coding-agents-in-a-team/) follows one change through the whole cycle, and the note on [an issue tracker for AI coding agents](/notes/issue-tracker-for-ai-coding-agents/) covers the work items behind the changes. [ISO 27001 controls for AI coding agents](/notes/iso-27001-controls-for-ai-coding-agents/) maps agent use to the other Annex A controls. The workspace that holds RFCs, change records and incidents next to the issues is described on the [Pync](/platforms/pync/) platform page.

## Frequently asked questions

### Does ISO 27001 require a change management procedure?

ISO/IEC 27001:2022 lists change management among its Annex A controls. Read the standard for the exact wording of the control; this note describes a practical procedure for software teams and does not quote it.

### Is every pull request an RFC?

That depends on how your procedure is written. One workable design lets the pull request, with its checks, review and approval, serve as the change record for routine code changes, and sends infrastructure, access and configuration changes through a separate request for change. Whatever the design, the procedure should say which route each kind of change takes.

### Can the author of a change approve it?

The approval should come from someone other than the author, which is the point of the four-eyes principle. When an AI agent writes the change, the agent is the author and a person approves. At Finray a person approves the exact version that was reviewed and tested.

### How should emergency changes be handled?

Allow them when waiting would cause more harm than the change itself, have a named person authorise them, and record them afterwards with the reason and a link to the incident. Review each emergency change after the fact.

### Can an AI agent approve a change?

It should not. At Finray, agents write and check code, and a person approves the exact version before it is merged. Any later change to that version restarts review.

### Where does Pync fit in change management?

Pync keeps RFCs and change records, access requests, incident reports and the asset register in the same workspace as the issues, so each change traces back to the work that needed it.

## Sources

- [ISO/IEC 27001:2022, Information security management systems: requirements](https://www.iso.org/standard/27001)
- [Finray: How Finray builds software with AI agents (path of one change)](https://finray.tech/company/how-we-build/)
- [Finray: Pync, delivery and ISMS workspace](https://finray.tech/platforms/pync/)